Signal controller on Bismarck intersections

Description

New signal controller systems along 7th and 9th streets at the intersections of Front Avenue, Main Avenue, Boulevard Avenue, Thayer Avenue, Rosser Avenue, and Avenue C. The systems would include video detection and interconnect fiber optic cable. The City of Bismarck (Bismarck Engineers) plans to connect this fiber to the City Engineering building during this project. This City of Bismarck may extend this system per their master plan for fiber optic interconnect throughout the city.

Status: Existing

Timeframe: Through 2030

Stakeholders

Bis–Man Emergency Management Agencies
Bismarck Engineering

Inventory

Bis–Man Emergency Vehicles
Bismarck Centracs Server
Bismarck Engineering Field Devices

Services

PS03–Emergency Vehicle Preemption
TM01–Infrastructure–Based Traffic Surveillance
TM03–City of Bismarck Traffic Signal Control

Interfaces

SourceFlowDestinationStatus
Bis–Man Emergency Vehicleslocal signal preemption requestBismarck Engineering Field DevicesExisting
Bismarck Centracs Serversignal control commandsBismarck Engineering Field DevicesExisting
Bismarck Centracs Serversignal control device configurationBismarck Engineering Field DevicesExisting
Bismarck Centracs Serversignal control plansBismarck Engineering Field DevicesExisting
Bismarck Centracs Serversignal system configurationBismarck Engineering Field DevicesExisting
Bismarck Centracs Servertraffic detector controlBismarck Engineering Field DevicesExisting
Bismarck Centracs Servertraffic operator dataBismarck EngineersExisting
Bismarck Engineering Field Devicessignal control statusBismarck Centracs ServerExisting
Bismarck Engineering Field Devicestraffic detector dataBismarck Centracs ServerExisting
Bismarck Engineering Field Devicestraffic image meta dataBismarck Centracs ServerPlanned