Objective 5.2

Statement: Manage the System Through Technology

Description

Consider the application of ITS to help mitigate the need for capital–intensive projects and associated impacts.

Source: Arrive 2050– Metropolitan Transportation Plan

Associated Performance Measures

CategoryNumberPerformance Measure
 1Safety and Security
 2Infrastructure Condition
 3Congestion reduction

Associated Service Packages

MC01: Maintenance and Construction Vehicle and Equipment Tracking
MC04: Winter Maintenance
MC05: Roadway Maintenance and Construction
MC06: Work Zone Management
PS01: Emergency Call–Taking and Dispatch
PS02: Emergency Response
PS03: Emergency Vehicle Preemption
PS10: Wide–Area Alert
PT01: Transit Vehicle Tracking
PT02: Transit Fixed–Route Operations
PT03: Dynamic Transit Operations
PT04: Transit Fare Collection Management
PT05: Transit Security
PT06: Transit Fleet Management
TM01: Infrastructure–Based Traffic Surveillance
TM03: City of Bismarck Traffic Signal Control
TM03: City of Mandan Traffic Signal Control
TM03: Traffic Signal Control
TM08: Traffic Incident Management System
TM13: Standard Railroad Grade Crossing
TM17: Speed Warning and Enforcement