Objective 5.2
Statement: Manage the System Through Technology
Description
Consider the application of ITS to help mitigate the need for capital–intensive projects and associated impacts.
Source: Arrive 2050– Metropolitan Transportation Plan
Associated Performance Measures
| Category | Number | Performance Measure |
|---|
| | 1 | Safety and Security |
|---|
| | 2 | Infrastructure Condition |
|---|
| | 3 | Congestion reduction |
|---|
Associated Service Packages
| MC01: Maintenance and Construction Vehicle and Equipment Tracking |
|---|
| MC04: Winter Maintenance |
|---|
| MC05: Roadway Maintenance and Construction |
|---|
| MC06: Work Zone Management |
|---|
| PS01: Emergency Call–Taking and Dispatch |
|---|
| PS02: Emergency Response |
|---|
| PS03: Emergency Vehicle Preemption |
|---|
| PS10: Wide–Area Alert |
|---|
| PT01: Transit Vehicle Tracking |
|---|
| PT02: Transit Fixed–Route Operations |
|---|
| PT03: Dynamic Transit Operations |
|---|
| PT04: Transit Fare Collection Management |
|---|
| PT05: Transit Security |
|---|
| PT06: Transit Fleet Management |
|---|
| TM01: Infrastructure–Based Traffic Surveillance |
|---|
| TM03: City of Bismarck Traffic Signal Control |
|---|
| TM03: City of Mandan Traffic Signal Control |
|---|
| TM03: Traffic Signal Control |
|---|
| TM08: Traffic Incident Management System |
|---|
| TM13: Standard Railroad Grade Crossing |
|---|
| TM17: Speed Warning and Enforcement |
|---|