Objective 2.2
Statement
Limit recurring peak period delay on the NHS and arterial roadways.
Associated Performance Measures
Category | Number | Performance Measure |
---|
| | Project would improve traffic operations/ improve forecasted level–of–service (use LOS E/F as deficiency). At a policy level, this would be part of the Congestion Management Plan and on–going system monitoring. |
---|
Associated Service Packages
DM02: Performance Monitoring |
---|
TM01: Infrastructure–Based Traffic Surveillance |
---|
TM01: Infrastructure–Based Traffic Surveillance (Centralized) |
---|
TM01: Infrastructure–Based Traffic Surveillance (Hybrid) |
---|
TM03: Traffic Signal Control |
---|
TM03: Traffic Signal Control (Centralized) |
---|
TM03: Traffic Signal Control (Hybrid) |
---|