Objective 2.2

Statement

Limit recurring peak period delay on the NHS and arterial roadways.

Associated Performance Measures

CategoryNumberPerformance Measure
  Project would improve traffic operations/ improve forecasted level–of–service (use LOS E/F as deficiency). At a policy level, this would be part of the Congestion Management Plan and on–going system monitoring.

Associated Service Packages

DM02: Performance Monitoring
TM01: Infrastructure–Based Traffic Surveillance
TM01: Infrastructure–Based Traffic Surveillance (Centralized)
TM01: Infrastructure–Based Traffic Surveillance (Hybrid)
TM03: Traffic Signal Control
TM03: Traffic Signal Control (Centralized)
TM03: Traffic Signal Control (Hybrid)