Interface: GF PW Operations Center - GF TOC

GF PW Operations Center to GF TOC Interface Diagram

Information Flow Definitions

current infrastructure restrictions  (Existing)  Selected Comm Solution

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

equipment maintenance request  (Planned)  

Identification of field equipment requiring repair and known information about the associated faults.

equipment maintenance status  (Planned)  

Current status of field equipment maintenance actions.

incident information  (Existing)  Selected Comm Solution

Notification of existence of incident and expected severity, location, time and nature of incident. As additional information is gathered and the incident evolves, updated incident information is provided. Incidents include any event that impacts transportation system operation ranging from routine incidents (e.g., disabled vehicle at the side of the road) through large–scale natural or human–caused disasters that involve loss of life, injuries, extensive property damage, and multi–jurisdictional response. This also includes special events, closures, and other planned events that may impact the transportation system.

maint and constr resource request  (Existing)  Selected Comm Solution

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre–staging, staging, or immediate dispatch of resources.

maint and constr resource response  (Planned)  Selected Comm Solution

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

maint and constr work plans  (Planned)  Selected Comm Solution

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

road weather information  (Planned)  Selected Comm Solution

Road conditions and weather information that are made available by road maintenance operations to other transportation system operators.

work plan feedback  (Planned)  Selected Comm Solution

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.